Project overview
The first clean, renewable in-river energy farm was installed in 2018 on the Rhone River comprising of 4 turbines of 80KW each connected to the French national grid.
TURN-KEY POWER PLANT SERVICES
- Site feasibility studies
- Manufacturing and assembly
- Shipping
- Site installation
- Electrical connection to the grid
- Commissioning
- Maintenance programs
80
KW / turbine
Assets
Our solution for River Power is adapted for local installation and isolated sites, to provide clean, cost-effective, and continuous energy to limited power demand markets.
Simple to operate and maintain
Low impact and environmentally beneficial
Simple engineering and installation
Low CAPEX and fast payback
