Project overview
The first hydrokinetic river farm was installed in 2018 on the Rhône River.
4 turbines of 80kW each, connected to French national grid.
TURN-KEY POWER PLANT SERVICES
- Site feasibility studies
- Manufacturing and assembly
- Shipping
- Site installation
- Electrical connection to the grid
- Commissioning
- Maintenance programs
100
KW / turbine
Assets
Our solution for River Power is adapted for local installation and isolated sites, to provide clean, cost-effective, and continuous energy.
Easy maintenance and cleaning
Minimally invasive and inaudible
No civil engineering
Minimally CAPEX
